Building a future UNE Tamworth Campus is a step closer with demolition works underway at the former velodrome site.
Demolition works started in July at the Peel Street site with the velodrome track rail removed, the concrete track surface demolished and the pedestrian access culverts removed.
A bulldozer is now reshaping the existing earth embankments so the site is suitable for future development of the campus. The demolition and earthworks (expected to be completed by mid-September) are being undertaken as part of Council’s contribution as a project partner.